Anne Carlsen Center
 




watch ACC video
tell a friend about ACC
tell a friend about ACC
downloads

About Us
Programs Services
Careers
Family Resources
News and Events
Foundation
Donate Now
Conferences Workshops

 

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 ACC Home


Emergency crews construct a clay levee on Third Street SW in Jamestown, next to the ACC campus.


Rick Owens cleans out an opening in a manhole before fitting it with a bubble plug.


A dump truck unloads clay along Third Street SW, in between the Center's main campus building and the cottages.


A bulldozer smoothes out clay along a dike built next to the Center.


A bulldozer operator measures the height of the dike he is helping to construct.


Traffic has been reduced to one lane in front of the Anne Carlsen Center's Jamestown Campus.


ACC Adaptive Equipment Specialist Todd Kollman and ACC Plant Operations Specialist Clayton Cordell assemble bubble plugs to help regulate the flow of water near the Center.


Rick Owens and Todd Kollman work with an air hose that runs to a bubble plug.


Rick Owens, the Center's Plant Operations Manager, disappears through a manhole to install a bubble plug.


A dump truck unloads clay onto a dike that will run between two bridges located near the Center.


ACC Plant Operations Manager Rick Owens and ACC Adaptive Equipment Specialist Todd Kollman hook up an air hose that will help keep a bubble plug at a specific air pressure.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 ACC Home

 
© 2010 Anne Carlsen Center
701 3rd St. NW, PO Box 8000, Jamestown, N.D. 58402 |   1-800-568-5175